Overview
Last refreshed: just now
Total Users
—
Total Orgs
—
Active Projects
—
Analyses Run
—
Credits Outstanding
—
Meters Online
—
Open Tickets
—
Recent Signups
View all →
| Name | Org | Signed Up |
|---|---|---|
| Loading… | ||
Active Alerts
View all →
Loading…
Conversion Funnel — All Time
Full funnel →
47
Signups
100%
39
1st Project
83%
31
Fingerprint
66%
18
Analysis
38%
6
2nd Purchase
13%
Users
app.wattchop.com
| Full Name | Organization | Role | Projects | Analyses | Last Active | Status | |
|---|---|---|---|---|---|---|---|
| Loading… | |||||||
All Projects
Loading…
| Project Name | Org | Tariff | Peak kW | Annual kWh | Battery kWh | Savings/yr | Stage | Updated |
|---|---|---|---|---|---|---|---|---|
| Loading… | ||||||||
Conversion Funnel
All time | app.wattchop.com
Signups
47
Baseline
Created Project
39
83% of signups
Got Fingerprint
31
66% of signups
Used Analysis
18
38% of signups
2nd Purchase
6
13% of signups
Signups per Day (Last 14d)
Data Source Split
Interval Upload (Green Button / CSV)
68%
Synthesizer (from utility bills)
32%
Stuck Users — Never Used Free Analysis Credit
Send nudge email →
| Org | Projects | Has Interval Data | Has Tariff | Signed Up | Action | |
|---|---|---|---|---|---|---|
| k.torres@pvpro.com | PV Pro | 1 | No | Yes | 3d ago | Nudge |
| b.nguyen@ecowatt.co | EcoWatt | 2 | Yes | No | 5d ago | Nudge |
Credit Ledger
Analysis & dispatch credit activity across all organizations
Analysis Credits
—
Dispatch Credits
—
Orgs with Credits
—
Burned (30d)
—
Reseller Outstanding
—
Organization Balances
+ Issue Credits
| Organization | Analysis | Dispatch | Self | Reseller | Reseller? |
|---|---|---|---|---|---|
| Loading… | |||||
Transaction History
| Timestamp | User | Org | Type | Source | Amount | Project | Balance |
|---|---|---|---|---|---|---|---|
| Loading… | |||||||
Support Tickets
Loading…
Open
—
In Progress
—
Avg Response
—
Resolved This Week
—
| Ticket | Subject | Category | Submitter | Project | Age | ||
|---|---|---|---|---|---|---|---|
| Loading… | |||||||
WC-0000
×
Status
Priority
Assigned To
Category
Subject
Description
Internal Notes
No notes yet.
Site Status
EnergyBoom managed sites — 100+ eGauge meters
Sites Online
104
↑ 98% uptime
Sites Offline
2
Needs attention
Degraded
3
Data gaps detected
Avg SOC
62%
Across all batteries
All Sites
2 offline
Fresno Cold Storage
eGauge #4412 · Site ID: FC-001
Last Seen
47m ago
SOC
—
kW now
—
Stockton Warehouse
eGauge #5501 · Site ID: SW-014
Last Seen
3h ago
SOC
—
kW now
—
Bakersfield Industrial
eGauge #3307 · Site ID: BI-007
Last Seen
2m ago
SOC
78%
kW now
142
HRC Site A
eGauge #2201 · Site ID: HRC-001
Last Seen
30s ago
SOC
54%
kW now
218
Modesto Retail Ctr
eGauge #1102 · Site ID: MRC-003
Last Seen
1m ago
SOC
91%
kW now
89
Visalia Distribution
eGauge #6601 · Site ID: VD-022
Last Seen
45s ago
SOC
33%
kW now
304
+99 more sites
wire to eGauge API
eGauge Meters
Commission & manage eGauge meter connections
Meter Registry
⚡ Commission New Meter
| eGauge ID | Site | Project | wc_* | Status | ||
|---|---|---|---|---|---|---|
| Loading... | ||||||
Project Equipment
Select a project to view equipment tree
Equipment Tree
Metering Map
Documents
Notes
Select a project to load the equipment tree
Add a meter device to the equipment tree, then select it here
No documents uploaded yet
Alert Queue
5 open · 3 unacknowledged
Open Alerts
| Severity | Site | Message | First Seen | Duration | Ack'd | Action |
|---|---|---|---|---|---|---|
| critical | Fresno Cold Storage | eGauge EG-4412 offline — no data received | 14:02 UTC | 47 min | No | Ack |
| critical | Stockton Warehouse | eGauge EG-5501 offline — no data received | 11:30 UTC | 3h 19m | No | Ack |
| warning | Bakersfield Industrial | 2h data gap detected — 08:00–10:00 UTC | 10:05 UTC | 4h 44m | No | Ack |
| warning | Modesto Retail Ctr | Battery SOC below 10% threshold at 09:30 | 09:32 UTC | 5h 17m | Yes | Resolve |
| warning | HRC Site A | Dispatch missed AM peak window — SOC insufficient | yesterday | 22h+ | Yes | Resolve |
Edge Commissioning
Joystick control, live telemetry, command history
Site
no site selected
Live Telemetry
--
BATTERY
--
W
GRID
--
W
SOLAR
--
W
LOAD
--
W
Mode: --
Temp: --
Alarm: --
Joystick
Quick Schedule
Command Log
↻ Refresh
| Time | Command | Params | Status | Result |
|---|---|---|---|---|
| Select a site to view command history | ||||
—
Certified
—
Provisional
—
In RA
—
Stale
| Utility | Schedule | Option / Variant | Type | kW Range | Status | Rows | Action |
|---|
Organizations
organizations table
All Orgs
| Org Name | Status | Type | Users | Projects | Analyses | State | Created |
|---|---|---|---|---|---|---|---|
| Loading… | |||||||
API Keys
Manage partner & integration keys · Monitor traffic by org
Requests (24h)
—
Error Rate
—
Active Keys
—
Avg Latency
—
Issued Keys
+ Issue Key
| Prefix | Label | Org | Env | Last Used | 24h Req | Status | |
|---|---|---|---|---|---|---|---|
| Loading… | |||||||
Traffic
1h
24h
7d
Top Endpoints
No traffic data yet.
By Key
| Key | Org | Requests | Errors | Avg ms |
|---|---|---|---|---|
| No traffic yet. | ||||
eGauge Activate
Activate pipeline — commissioned eGauge meters → claimed dashboards
Commissioned
—
Active
—
Claimed
—
Claim Rate
—
Weekly Commissions
Loading…
Building Type Mix
Loading…
Recent Activity
| Serial | Status | Building Type | Owner | ZIP | Commissioned |
|---|---|---|---|---|---|
| Loading… | |||||
Edge Deploy
Generate pre-filled, plug-and-play configs for on-site edge agents
① Select Project
② Meter Credentials
Agent Status
no project selected
Select a project to see live agent status.
How It Works
1.
Select the project — timezone, utility, tariff, and site ID pre-fill automatically from the project record.
2.
Enter meter credentials. A unique edge API key is generated and embedded in the ZIP.
3.
Copy ZIP to the gateway (SD card, SCP, or USB stick). Run
sudo bash install.sh
4.
Agent calls home. Status above turns ● Online within minutes.